Week 8 - 4/9/2018

Today, we got a good amount done. We are adding a master link to bike ones chain from the motor sprocket to the chains on the bike. The motor is mounted safely to the bike. We drilled holes into the bikes frame to make it easier to bracket. We are nearing completion of the first bike and started on the second bike. We measured out and drilled holes for the battery bracket. We successfully completed the right side of the bracket connecting to the bike. Once we finish the left side, we can put a platform on top of it and put the batteries and motor controller on top.